Find exactly what you are looking for

  • Select your location and language

  • Transport from above
    • Blog
    • Special Logistics

    Transport of a Tunnel Boring Machine

    18 months of preparing the implementation of this demanding transport operation

    DB SCHENKER in Poland took over the transport of the unique TBM (Tunnel Boring Machine) and it was one of the most difficult and complex logistic projects implemented so far in Poland. This machine was designed for tunnel boring on the construction site of the S19 expressway in Babica near Rzeszów. The machine, consisting of many parts, was transported from Spain to Poland. Its weight exceeded 4,000 tons, its length was 107 meters, and the diameter of the drilling disc was 15.2 meters.

    Tomasz Kwapis, Head of the Oversized Transport Department at DB SCHENKER: “Many factors were taken into account when implementing this project. We are talking not only about the law regulations determining the transport of oversized items. It also included, for example, verification of bridges and viaducts construction strength, or investigating the possibility of carrying out all the necessary maneuvers with special semi-trailer that carries the heaviest TBM elements weighing up to 230 tons.”


    Tunnel Boring Machine: One of the heaviest loads ever on Polish roads

    The heaviest components, including the main drive and the cutting disc, were transported by DB SCHENKER to the port of Santander, from where they were delivered to Szczecin within a week after loading. The next stage will involve floating them on special barges down the Oder River to Opole. There, the machine components will be unloaded and properly secured on platforms equipped with self-propelled axles. After that, they will be transported by truck to Babica. Lighter components will be transported directly by truck from Spain to the Podkarpacie region.

    In order make the transport possible, it was necessary to build a dedicated expressway exit for the operation in order to allow the platform to turn. In accordance with regulations, the transport was carried out at night at a speed of between 10 and 15 kilometers per hour. The semitrailer had 396 bridges, viaducts, and interchanges and intersections to cross on its way.

    The impressive TBM

    The TBM is a powerful machine that has bored one of the longest tunnels in Poland (2,255 meters) under the Grochowiczna hill in the Podkarpacie region. The machine’s working speed ranges from a few centimeters per minute to about 10 meters per day. The TBM weighs 4,300 tons, has a power output of 12,000 kilowatts, a length of 107 meters, and a tunneling disc diameter of 15.2 meters. The machine was previously used for the construction of Madrid’s orbital expressway. 

    Video from Mostostal Warszawa

    Watch Video

    Video from Mostostal Warszawa

    Consent to use Cookies and collect data

    We use first party cookies and similar technologies to ensure that you get the best possible experience on our website. Cookies provide us with statistics to adjust and optimize the setting and content of this website to your interests and to place relevant advertisement by using first and third parties, too. By clicking "Allow all Cookies" you accept the processing of your data and its transfer to first and third parties. By clicking "Reject Tracking" you will only accept the necessary cookies for the operation of this website. 

    You can find more details regarding the use and purpose of cookies, including first and third-party cookies, in our cookie settings. You can reject the use of cookies and other technologies and withdraw your consent any time with future effect by deactivating the respective code category in the cookie settings. You can find more information regarding these settings and the processing of your data in our privacy policy.

  • Cookies and tracking scripts

    We want to give you the opportunity to make an informed decision for or against the use of cookies, which are not mandatory for the technical functions of the website. Cookies are small text files in which personal data can be stored.

    Our privacy policy is intended to ensure that you are fully aware of the collection and processing of data, including through the use of cookies through our sites, and that you can make a decision that is appropriately informed. However you can change your cookie settings at any time.

    Please find further information within our data privacy policy.