Hľadať
Výsledky (383)
Scenáre nároku na poistné plnenie
Poistenie nákladu
Stiahnuť mapu služby DB SCHENKER | skybridge
Stiahnuť mapu služby DB SCHENKER | skybridge
Contact List - DB Schenker Global Projects & Industry Solutions
More about DB SCHENKER | complete
39,000 kilometers: This is the overall distance travelled by 50 special trucks to transport various parts of machinery from Port Hedland, Australia, to the iron ore mine owned by BHP. The largest and heaviest parts represented the greatest challenge, since these had to be transported overnight. With blocked roads and a maximum speed of 40 kilometers per hour, it took three nights to reach the mine. In total, 90,000 tons of machinery were transported.
39,000 kilometers: This is the overall distance travelled by 50 special trucks to transport various parts of machinery from Port Hedland, Australia, to the iron ore mine owned by BHP. The largest and heaviest parts represented the greatest challenge, since these had to be transported overnight. With blocked roads and a maximum speed of 40 kilometers per hour, it took three nights to reach the mine. In total, 90,000 tons of machinery were transported.
Prečítajte si viac Prečítajte si viacWe invested in a new Gottwald HMK 5506 Mobile Harbor Crane for the Constanta MOL1S Terminal. With an outreach of 51 meters and a lifting capacity of 125 tons, the crane will facilitate increased productivity, better solutions for customers and new opportunities in terms of bulk and heavy lift loads. In 2020, DB Schenker extended the concession with the Romanian Port Authorities for the next 20 years and will invest in lifting equipment, infrastructure, digitalization, and human resources.
Case Study – Server Rack Components Management
Case Study – Server Rack Spares
Spoznajte systém DB SCHENKER LCL system
Profitujte z nášho spoľahlivého a inteligentného riešenia pre rýchle a jednoduché doručenie zásielok.
Prečítajte si viac Prečítajte si viac